Track Train back

Track Train


Running Status

Overview of 18519 Vskp Ltt Express

Want to know more of a daily Mail/Express train titled as Visakhapatnam – Lokmanya Tilak Terminus Express running with the train number 18519? If yes, do read on the following and you will come to know of the same.Train 18519 runs between Vishakapatnam and Lokmanya Tilak Term. The coach composition of the express is been like comprised with AC coaches having 1,2,3 Tier, Sleeper class , general sitting and second class sitting type of coaches. Train consists of 22 LHB Coaches that includes 1 second ac coach, 1 first ac coach, 10 sleeper coaches and 2 third ac coaches. The train changes its engine at Vijayawada Jn station. Train No 18519 leaves Vishakapatnam railway station (ALD)at 23:25 PM and arrives back to Lokmanya Tilak Term at 04:40 AM.

The total distance traveled by the train is 1494 km and it takes 29 hours and 15 minutes with the running speed of 59 km/hour. This train runs on daily basis and intermediates around 275 places However, stops at 18 stations in its route , few prime station names were Samalkot, Rajamundry , Gudivada Jn , Vijayawada , Kazipet, Secundrabad Jn , Tandur, Wadi jn, Pune jn and so on. Train has maximum halt time at Vijaywada Jn and Secunderabad Jn around 15 mins. The fare structure of the train is Rs 3,995/- for 1A , Rs 2,330/- for 2A , Rs 1,590/- for 3A , Rs 590/- for Sleeper , Rs 330/- for General coaches.After getting all the important information about the train your journey will more comfortable!

Spot your running train status 18519/VSKP LTT EXPRES

Check the current running status of 18519/VSKP LTT EXPRES which runs between VISAKHAPATNAM to LOKMANYATILAK Mentioned below are the details of your running train which includes arrival and departure timings, present station of the train, train delay and arrival timings.

18519 / VSKP LTT EXPRES(VISAKHAPATNAM - LOKMANYATILAK) Running Train Status

    RunsOn-
  • Sun
  • Mon
  • Tue
  • Wed
  • Thu
  • Fri
  • Sat
  • Current Station VISAKHAPATNAM
  • Start Date 13 Jan 2026
  • Last Updated 23:33 13-Jan-2026
  • Status Yet to start
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

VISAKHAPATNAM (VSKP)

Origin/Origin

--/23:20

--

On Time

1

Platform 8

DUVVADA (DVD)

23:50/23:50

23:52/23:52

2 min

On Time

1

Platform 1

PITHAPURAM (PAP)

01:24/01:24

01:25/01:25

1 min

On Time

2

Platform 2

SAMALKOT JN (SLO)

01:38/01:38

01:40/01:40

2 min

On Time

2

Platform 3

RAJAMUNDRY (RJY)

02:23/02:23

02:25/02:25

2 min

On Time

2

Platform 1

TANUKU (TNKU)

03:23/03:23

03:25/03:25

2 min

On Time

2

Platform 1

BHIMAVARAM TOWN (BVRT)

03:59/03:59

04:00/04:00

1 min

On Time

2

N.A

AKIVIDU (AKVD)

04:19/04:19

04:20/04:20

1 min

On Time

2

Platform 1

KAIKOLUR (KKLR)

04:39/04:39

04:40/04:40

1 min

On Time

2

Platform 2

GUDIVADA JN (GDV)

05:13/05:13

05:15/05:15

2 min

On Time

2

Platform 3

VIJAYAWADA JN (BZA)

06:40/06:40

06:55/06:55

15 min

On Time

2

Platform 7

KAZIPET JN (KZJ)

10:28/10:28

10:30/10:30

2 min

On Time

2

Platform 2

CHARLAPALLI (CHZ)

12:18/12:18

12:20/12:20

2 min

On Time

2

Platform 5

SECUNDERABAD JN (SC)

12:40/12:40

12:50/12:50

10 min

On Time

2

Platform 3

HIGH TECH CITY (HTCY)

13:14/13:14

13:15/13:15

1 min

On Time

2

N.A

LINGAMPALLI (LPI)

13:29/13:29

13:30/13:30

1 min

On Time

2

Platform 2

VIKARABAD JN (VKB)

14:24/14:24

14:25/14:25

1 min

On Time

2

Platform 1

TANDUR (TDU)

14:59/14:59

15:00/15:00

1 min

On Time

2

Platform 2

WADI JN. (WADI)

16:28/16:28

16:30/16:30

2 min

On Time

2

Platform 3

KALABURAGI (KLBG)

17:02/17:02

17:05/17:05

3 min

On Time

2

Platform 1

SOLAPUR JN (SUR)

19:45/19:45

19:50/19:50

5 min

On Time

2

Platform 4

PUNE JN (PUNE)

00:35/00:35

00:40/00:40

5 min

On Time

3

Platform 1

LONAVALA (LNL)

01:54/01:54

01:56/01:56

2 min

On Time

3

Platform 2

KALYAN JN (KYN)

03:10/03:10

03:12/03:12

2 min

On Time

3

Platform 6

LOKMANYATILAK (LTT)

04:30/04:30

Destination/Destination

--

On Time

3

Platform 3

  • Current Station KEDGAON
  • Start Date 12 Jan 2026
  • Last Updated 23:33 13-Jan-2026
  • Status Train Started
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

VISAKHAPATNAM (VSKP)

Origin/Origin

23:20/23:20

0 min

Departed / On Time

1

Platform 8

DUVVADA (DVD)

23:44/23:50

23:52/23:52

8 min

Departed / On Time

1

Platform 1

PITHAPURAM (PAP)

01:13/01:24

01:25/01:25

12 min

Departed / On Time

2

Platform 2

SAMALKOT JN (SLO)

01:37/01:38

01:41/01:40

4 min

Departed / Late by 1 min

2

Platform 3

RAJAMUNDRY (RJY)

02:27/02:23

02:32/02:25

5 min

Departed / Late by 7 min

2

Platform 1

TANUKU (TNKU)

03:26/03:23

03:28/03:25

2 min

Departed / Late by 3 min

2

Platform 1

BHIMAVARAM TOWN (BVRT)

04:00/03:59

--/--

--

Non-Reporting Station

2

N.A

AKIVIDU (AKVD)

04:23/04:19

04:26/04:20

3 min

Departed / Late by 6 min

2

Platform 1

KAIKOLUR (KKLR)

04:42/04:39

04:45/04:40

3 min

Departed / Late by 5 min

2

Platform 2

GUDIVADA JN (GDV)

05:17/05:13

05:19/05:15

2 min

Departed / Late by 4 min

2

Platform 3

VIJAYAWADA JN (BZA)

06:52/06:40

07:24/06:55

32 min

Departed / Late by 29 min

2

Platform 7

KAZIPET JN (KZJ)

10:44/10:28

10:47/10:30

3 min

Departed / Late by 17 min

2

Platform 2

CHARLAPALLI (CHZ)

12:23/12:18

12:25/12:20

2 min

Departed / Late by 5 min

2

Platform 5

SECUNDERABAD JN (SC)

12:56/12:40

13:11/12:50

15 min

Departed / Late by 21 min

2

Platform 10

HIGH TECH CITY (HTCY)

13:15/13:14

--/--

--

Non-Reporting Station

2

N.A

LINGAMPALLI (LPI)

13:56/13:29

13:58/13:30

2 min

Departed / Late by 28 min

2

Platform 2

VIKARABAD JN (VKB)

14:35/14:24

14:37/14:25

2 min

Departed / Late by 12 min

2

Platform 1

TANDUR (TDU)

15:14/14:59

15:15/15:00

1 min

Departed / Late by 15 min

2

Platform 2

WADI JN. (WADI)

16:35/16:28

16:44/16:30

9 min

Departed / Late by 14 min

2

Platform 3

KALABURAGI (KLBG)

17:21/17:02

17:24/17:05

3 min

Departed / Late by 19 min

2

Platform 1

SOLAPUR JN (SUR)

19:57/19:45

20:04/19:50

7 min

Departed / Late by 14 min

2

Platform 4

PUNE JN (PUNE)

00:36/00:35

00:40/00:40

4 min

Late by 1 min

3

Platform 1

LONAVALA (LNL)

01:54/01:54

01:56/01:56

2 min

On Time

3

Platform 2

KALYAN JN (KYN)

03:10/03:10

03:12/03:12

2 min

On Time

3

Platform 6

LOKMANYATILAK (LTT)

04:30/04:30

Destination/Destination

--

On Time

3

Platform 3

  • Current Station LOKMANYATILAK
  • Start Date 11 Jan 2026
  • Last Updated 23:33 13-Jan-2026
  • Status Train Started
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

VISAKHAPATNAM (VSKP)

Origin/Origin

23:20/23:20

0 min

Departed / On Time

1

Platform 8

DUVVADA (DVD)

23:55/23:50

23:57/23:52

2 min

Departed / Late by 5 min

1

Platform 1

PITHAPURAM (PAP)

01:44/01:24

01:47/01:25

3 min

Departed / Late by 22 min

2

Platform 2

SAMALKOT JN (SLO)

01:58/01:38

02:01/01:40

3 min

Departed / Late by 21 min

2

Platform 3

RAJAMUNDRY (RJY)

02:40/02:23

02:45/02:25

5 min

Departed / Late by 20 min

2

Platform 1

TANUKU (TNKU)

03:50/03:23

03:53/03:25

3 min

Departed / Late by 28 min

2

Platform 1

BHIMAVARAM TOWN (BVRT)

04:00/03:59

--/--

--

Non-Reporting Station

2

N.A

AKIVIDU (AKVD)

05:00/04:19

05:02/04:20

2 min

Departed / Late by 42 min

2

Platform 1

KAIKOLUR (KKLR)

05:18/04:39

05:20/04:40

2 min

Departed / Late by 40 min

2

Platform 2

GUDIVADA JN (GDV)

05:57/05:13

06:00/05:15

3 min

Departed / Late by 45 min

2

Platform 3

VIJAYAWADA JN (BZA)

07:01/06:40

07:22/06:55

21 min

Departed / Late by 27 min

2

Platform 7

KAZIPET JN (KZJ)

10:54/10:28

11:06/10:30

12 min

Departed / Late by 36 min

2

Platform 2

CHARLAPALLI (CHZ)

12:48/12:18

12:49/12:20

1 min

Departed / Late by 30 min

2

Platform 5

SECUNDERABAD JN (SC)

13:13/12:40

13:22/12:50

9 min

Departed / Late by 33 min

2

Platform 10

HIGH TECH CITY (HTCY)

13:15/13:14

--/--

--

Non-Reporting Station

2

N.A

LINGAMPALLI (LPI)

14:13/13:29

14:15/13:30

2 min

Departed / Late by 45 min

2

Platform 2

VIKARABAD JN (VKB)

15:01/14:24

15:04/14:25

3 min

Departed / Late by 39 min

2

Platform 1

TANDUR (TDU)

15:43/14:59

15:46/15:00

3 min

Departed / Late by 46 min

2

Platform 2

WADI JN. (WADI)

16:55/16:28

17:23/16:30

28 min

Departed / Late by 53 min

2

Platform 3

KALABURAGI (KLBG)

17:59/17:02

18:03/17:05

4 min

Departed / Late by 58 min

2

Platform 1

SOLAPUR JN (SUR)

20:19/19:45

20:28/19:50

9 min

Departed / Late by 38 min

2

Platform 3

PUNE JN (PUNE)

00:29/00:35

00:41/00:40

12 min

Departed / Late by 1 min

3

Platform 3

LONAVALA (LNL)

01:51/01:54

01:56/01:56

5 min

Departed / On Time

3

Platform 2

KALYAN JN (KYN)

03:33/03:10

03:36/03:12

3 min

Departed / Late by 24 min

3

Platform 6

LOKMANYATILAK (LTT)

04:17/04:30

Destination/Destination

--

Arrived / On Time

3

Platform 3

  • Current Station LOKMANYATILAK
  • Start Date 10 Jan 2026
  • Last Updated 02:15 13-Jan-2026
  • Status Train Diverted
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

VISAKHAPATNAM (VSKP)

Origin/Origin

23:20/23:20

0 min

Departed / On Time

1

Platform 8

DUVVADA (DVD)

23:40/23:50

23:57/23:52

17 min

Departed / Late by 5 min

1

Platform 1

PITHAPURAM (PAP)

01:45/01:24

01:47/01:25

2 min

Departed / Late by 22 min

2

Platform 2

SAMALKOT JN (SLO)

01:59/01:38

02:02/01:40

3 min

Departed / Late by 22 min

2

Platform 3

RAJAMUNDRY (RJY)

02:45/02:23

02:50/02:25

5 min

Departed / Late by 25 min

2

Platform 1

TANUKU (TNKU)

03:40/03:23

03:42/03:25

2 min

Departed / Late by 17 min

2

Platform 1

BHIMAVARAM TOWN (BVRT)

04:00/03:59

--/--

--

Non-Reporting Station

2

N.A

AKIVIDU (AKVD)

04:38/04:19

04:40/04:20

2 min

Departed / Late by 20 min

2

Platform 1

KAIKOLUR (KKLR)

04:56/04:39

05:00/04:40

4 min

Departed / Late by 20 min

2

Platform 2

GUDIVADA JN (GDV)

05:39/05:13

05:41/05:15

2 min

Departed / Late by 26 min

2

Platform 3

VIJAYAWADA JN (BZA)

07:00/06:40

07:25/06:55

25 min

Departed / Late by 30 min

2

Platform 7

KAZIPET JN (KZJ)

10:40/10:28

10:43/10:30

3 min

Departed / Late by 13 min

2

Platform 2

CHARLAPALLI (CHZ)

12:27/12:18

12:37/12:20

10 min

Departed / Late by 17 min

2

Platform 5

SECUNDERABAD JN (SC)

13:01/12:40

13:11/12:50

10 min

Departed / Late by 21 min

2

Platform 3

HIGH TECH CITY (HTCY)

13:15/13:14

--/--

--

Non-Reporting Station

2

N.A

LINGAMPALLI (LPI)

14:01/13:29

14:03/13:30

2 min

Departed / Late by 33 min

2

Platform 2

VIKARABAD JN (VKB)

14:46/14:24

14:56/14:25

10 min

Departed / Late by 31 min

2

Platform 1

TANDUR (TDU)

15:35/14:59

15:38/15:00

3 min

Departed / Late by 38 min

2

Platform 2

WADI JN. (WADI)

16:43/16:28

16:46/16:30

3 min

Departed / Late by 16 min

2

Platform 3

KALABURAGI (KLBG)

17:18/17:02

17:21/17:05

3 min

Departed / Late by 16 min

2

Platform 1

SOLAPUR JN (SUR)

19:53/19:45

20:00/19:50

7 min

Departed / Late by 10 min

2

Platform 4

PUNE JN (PUNE)

00:43/00:35

00:51/00:40

8 min

Departed / Late by 11 min

3

Platform 3

LONAVALA (LNL)

01:50/01:54

01:56/01:56

6 min

Departed / On Time

3

Platform 2

KALYAN JN (KYN)

03:12/03:10

--/--

--

Arrived / Late by 2 min

3

Platform 6

LOKMANYATILAK (LTT)

05:57/04:30

Destination/Destination

--

Arrived / Late by 1hr 27min

3

Platform 2

  • Current Station LOKMANYATILAK
  • Start Date 09 Jan 2026
  • Last Updated 02:21 12-Jan-2026
  • Status Train Diverted
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

VISAKHAPATNAM (VSKP)

Origin/Origin

23:22/23:20

0 min

Departed / Late by 2 min

1

Platform 8

DUVVADA (DVD)

23:51/23:50

23:53/23:52

2 min

Departed / Late by 1 min

1

Platform 1

PITHAPURAM (PAP)

01:23/01:24

01:45/01:25

22 min

Departed / Late by 20 min

2

Platform 2

SAMALKOT JN (SLO)

02:11/01:38

02:14/01:40

3 min

Departed / Late by 34 min

2

Platform 3

RAJAMUNDRY (RJY)

03:04/02:23

03:08/02:25

4 min

Departed / Late by 43 min

2

Platform 1

TANUKU (TNKU)

04:06/03:23

04:10/03:25

4 min

Departed / Late by 45 min

2

Platform 1

BHIMAVARAM TOWN (BVRT)

04:00/03:59

--/--

--

Non-Reporting Station

2

N.A

AKIVIDU (AKVD)

05:02/04:19

05:03/04:20

1 min

Departed / Late by 43 min

2

Platform 1

KAIKOLUR (KKLR)

05:20/04:39

05:23/04:40

3 min

Departed / Late by 43 min

2

Platform 2

GUDIVADA JN (GDV)

06:00/05:13

06:02/05:15

2 min

Departed / Late by 47 min

2

Platform 3

VIJAYAWADA JN (BZA)

06:59/06:40

07:27/06:55

28 min

Departed / Late by 32 min

2

Platform 7

KAZIPET JN (KZJ)

10:31/10:28

10:42/10:30

11 min

Departed / Late by 12 min

2

Platform 2

CHARLAPALLI (CHZ)

12:20/12:18

12:27/12:20

7 min

Departed / Late by 7 min

2

Platform 5

SECUNDERABAD JN (SC)

12:50/12:40

13:17/12:50

27 min

Departed / Late by 27 min

2

Platform 9

HIGH TECH CITY (HTCY)

13:15/13:14

--/--

--

Non-Reporting Station

2

N.A

LINGAMPALLI (LPI)

13:30/13:29

--/--

--

Arrived / Late by 1 min

2

Platform 2

VIKARABAD JN (VKB)

14:41/14:24

14:45/14:25

4 min

Departed / Late by 20 min

2

Platform 1

TANDUR (TDU)

15:27/14:59

15:29/15:00

2 min

Departed / Late by 29 min

2

Platform 2

WADI JN. (WADI)

16:54/16:28

17:07/16:30

13 min

Departed / Late by 37 min

2

Platform 3

KALABURAGI (KLBG)

17:35/17:02

17:40/17:05

5 min

Departed / Late by 35 min

2

Platform 1

SOLAPUR JN (SUR)

19:34/19:45

19:53/19:50

19 min

Departed / Late by 3 min

2

Platform 2

PUNE JN (PUNE)

00:44/00:35

00:50/00:40

6 min

Departed / Late by 10 min

3

Platform 2

LONAVALA (LNL)

01:47/01:54

01:56/01:56

9 min

Departed / On Time

3

Platform 2

KALYAN JN (KYN)

03:12/03:10

--/--

--

Arrived / Late by 2 min

3

Platform 6

LOKMANYATILAK (LTT)

05:11/04:30

Destination/Destination

--

Arrived / Late by 41 min

3

Platform 3

  • Current Station LOKMANYATILAK
  • Start Date 08 Jan 2026
  • Last Updated 02:35 11-Jan-2026
  • Status Train Started
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

VISAKHAPATNAM (VSKP)

Origin/Origin

23:20/23:20

0 min

Departed / On Time

1

Platform 8

DUVVADA (DVD)

23:53/23:50

23:55/23:52

2 min

Departed / Late by 3 min

1

Platform 1

PITHAPURAM (PAP)

01:22/01:24

01:25/01:25

3 min

Departed / On Time

2

Platform 2

SAMALKOT JN (SLO)

01:37/01:38

01:40/01:40

3 min

Departed / On Time

2

Platform 3

RAJAMUNDRY (RJY)

02:25/02:23

02:28/02:25

3 min

Departed / Late by 3 min

2

Platform 1

TANUKU (TNKU)

03:19/03:23

03:25/03:25

6 min

Departed / On Time

2

Platform 1

BHIMAVARAM TOWN (BVRT)

04:00/03:59

--/--

--

Non-Reporting Station

2

N.A

AKIVIDU (AKVD)

04:19/04:19

04:22/04:20

3 min

Departed / Late by 2 min

2

Platform 1

KAIKOLUR (KKLR)

04:38/04:39

04:41/04:40

3 min

Departed / Late by 1 min

2

Platform 2

GUDIVADA JN (GDV)

05:11/05:13

05:16/05:15

5 min

Departed / Late by 1 min

2

Platform 3

VIJAYAWADA JN (BZA)

07:11/06:40

07:32/06:55

21 min

Departed / Late by 37 min

2

Platform 7

KAZIPET JN (KZJ)

10:33/10:28

10:43/10:30

10 min

Departed / Late by 13 min

2

Platform 2

CHARLAPALLI (CHZ)

12:18/12:18

12:21/12:20

3 min

Departed / Late by 1 min

2

Platform 5

SECUNDERABAD JN (SC)

12:46/12:40

12:54/12:50

8 min

Departed / Late by 6 min

2

Platform 3

HIGH TECH CITY (HTCY)

13:15/13:14

--/--

--

Non-Reporting Station

2

N.A

LINGAMPALLI (LPI)

13:30/13:29

--/--

--

Arrived / Late by 1 min

2

Platform 2

VIKARABAD JN (VKB)

14:36/14:24

14:40/14:25

4 min

Departed / Late by 15 min

2

Platform 1

TANDUR (TDU)

15:15/14:59

15:19/15:00

4 min

Departed / Late by 19 min

2

Platform 2

WADI JN. (WADI)

16:35/16:28

16:41/16:30

6 min

Departed / Late by 11 min

2

Platform 3

KALABURAGI (KLBG)

17:32/17:02

17:37/17:05

5 min

Departed / Late by 32 min

2

Platform 1

SOLAPUR JN (SUR)

20:06/19:45

20:23/19:50

17 min

Departed / Late by 33 min

2

Platform 4

PUNE JN (PUNE)

00:01/00:35

00:45/00:40

44 min

Departed / Late by 5 min

3

Platform 3

LONAVALA (LNL)

01:43/01:54

01:57/01:56

14 min

Departed / Late by 1 min

3

Platform 2

KALYAN JN (KYN)

03:35/03:10

03:35/03:12

0 min

Departed / Late by 25 min

3

Platform 6

LOKMANYATILAK (LTT)

04:17/04:30

Destination/Destination

--

Arrived / On Time

3

Platform 3

  • Current Station LOKMANYATILAK
  • Start Date 07 Jan 2026
  • Last Updated 02:50 10-Jan-2026
  • Status Train Started
  • Total Journey
Station Actual / Sch.
Arrival
Actual / Sch.
Departure
Halt Train
Status
Day Count Platform

VISAKHAPATNAM (VSKP)

Origin/Origin

00:28/23:20

0 min

Departed / On Time

1

Platform 8

DUVVADA (DVD)

01:06/23:50

01:09/23:52

3 min

Departed / On Time

2

Platform 1

PITHAPURAM (PAP)

02:51/01:24

02:53/01:25

2 min

Departed / Late by 1hr 28min

2

Platform 2

SAMALKOT JN (SLO)

03:06/01:38

03:09/01:40

3 min

Departed / Late by 1hr 29min

2

Platform 3

RAJAMUNDRY (RJY)

03:46/02:23

03:49/02:25

3 min

Departed / Late by 1hr 24min

2

Platform 1

TANUKU (TNKU)

04:47/03:23

04:49/03:25

2 min

Departed / Late by 1hr 24min

2

Platform 1

BHIMAVARAM TOWN (BVRT)

04:00/03:59

--/--

--

Non-Reporting Station

2

N.A

AKIVIDU (AKVD)

05:55/04:19

05:57/04:20

2 min

Departed / Late by 1hr 37min

2

Platform 1

KAIKOLUR (KKLR)

06:15/04:39

06:17/04:40

2 min

Departed / Late by 1hr 37min

2

Platform 2

GUDIVADA JN (GDV)

06:45/05:13

06:48/05:15

3 min

Departed / Late by 1hr 33min

2

Platform 3

VIJAYAWADA JN (BZA)

07:59/06:40

08:19/06:55

20 min

Departed / Late by 1hr 24min

2

Platform 7

KAZIPET JN (KZJ)

11:19/10:28

11:27/10:30

8 min

Departed / Late by 57 min

2

Platform 2

CHARLAPALLI (CHZ)

13:07/12:18

13:08/12:20

1 min

Departed / Late by 49 min

2

Platform 5

SECUNDERABAD JN (SC)

13:33/12:40

13:41/12:50

8 min

Departed / Late by 53 min

2

Platform 10

LINGAMPALLI (LPI)

14:35/13:29

14:37/13:30

2 min

Departed / Late by 1hr 7min

2

Platform 2

VIKARABAD JN (VKB)

15:17/14:24

15:18/14:25

1 min

Departed / Late by 53 min

2

Platform 1

TANDUR (TDU)

15:58/14:59

15:59/15:00

1 min

Departed / Late by 59 min

2

Platform 2

WADI JN. (WADI)

17:21/16:28

17:24/16:30

3 min

Departed / Late by 54 min

2

Platform 3

KALABURAGI (KLBG)

18:03/17:02

18:06/17:05

3 min

Departed / Late by 1hr 1min

2

Platform 1

SOLAPUR JN (SUR)

20:29/19:45

20:45/19:50

16 min

Departed / Late by 55 min

2

Platform 4

PUNE JN (PUNE)

00:40/00:35

00:52/00:40

12 min

Departed / Late by 12 min

3

Platform 2

LONAVALA (LNL)

01:53/01:54

01:56/01:56

3 min

Departed / On Time

3

Platform 2

KALYAN JN (KYN)

04:16/03:10

04:19/03:12

3 min

Departed / Late by 1hr 7min

3

Platform 6

LOKMANYATILAK (LTT)

05:03/04:30

Destination/Destination

--

Arrived / Late by 33 min

3

Platform 3

Train Delay Pattern of 18519 / VSKP LTT EXPRES

Station Arrival 2026-01-12 2026-01-11 2026-01-10 2026-01-09 2026-01-08 2026-01-07 2026-01-06
VISAKHAPATNAM (VSKP) Origin 0 min 0 min 0 min 0 min 0 min 0 min 0 min
DUVVADA (DVD) 23:50 0 min 5 min 0 min 1 min 3 min 0 min 9 min
PITHAPURAM (PAP) 01:24 0 min 20 min 21 min 0 min 0 min 87 min 11 min
SAMALKOT JN (SLO) 01:38 0 min 20 min 21 min 33 min 0 min 88 min 12 min
RAJAMUNDRY (RJY) 02:23 4 min 17 min 22 min 41 min 2 min 83 min 5 min
TANUKU (TNKU) 03:23 3 min 27 min 17 min 43 min 0 min 84 min 0 min
BHIMAVARAM TOWN (BVRT) 03:59 1 min 1 min 1 min 1 min 1 min 1 min 1 min
AKIVIDU (AKVD) 04:19 4 min 41 min 19 min 43 min 0 min 96 min 0 min
KAIKOLUR (KKLR) 04:39 3 min 39 min 17 min 41 min 0 min 96 min 0 min
GUDIVADA JN (GDV) 05:13 4 min 44 min 26 min 47 min 0 min 92 min 4 min
VIJAYAWADA JN (BZA) 06:40 12 min 21 min 20 min 19 min 31 min 79 min 2 min
KAZIPET JN (KZJ) 10:28 16 min 26 min 12 min 3 min 5 min 51 min 6 min
CHARLAPALLI (CHZ) 12:18 5 min 30 min 9 min 2 min 0 min 49 min 13 min
SECUNDERABAD JN (SC) 12:40 16 min 33 min 21 min 10 min 6 min 53 min 17 min
LINGAMPALLI (LPI) 13:29 27 min 44 min 32 min 1 min 1 min 66 min 31 min
VIKARABAD JN (VKB) 14:24 11 min 37 min 22 min 17 min 12 min 53 min 19 min
TANDUR (TDU) 14:59 15 min 44 min 36 min 28 min 16 min 59 min 25 min
WADI JN. (WADI) 16:28 7 min 27 min 15 min 26 min 7 min 53 min 15 min
KALABURAGI (KLBG) 17:02 19 min 57 min 16 min 33 min 30 min 61 min 35 min
SOLAPUR JN (SUR) 19:45 12 min 34 min 8 min 0 min 21 min 44 min 51 min
PUNE JN (PUNE) 00:35 1 min 0 min 8 min 9 min 0 min 5 min 0 min
LONAVALA (LNL) 01:54 0 min 0 min 0 min 0 min 0 min 0 min 0 min
KALYAN JN (KYN) 03:10 0 min 23 min 2 min 2 min 25 min 66 min 40 min
LOKMANYATILAK (LTT) 04:30 0 min 0 min 87 min 41 min 0 min 33 min 10 min
HIGH TECH CITY (HTCY) 13:14 1 min 1 min 1 min 1 min 1 min 0 min 0 min

Frequently Ask Question about Train

Train Running Status Live Updates

  • VSKP LTT EXPRES(18519) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • VSKP LTT EXPRES(18519) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • VSKP LTT EXPRES(18519) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • VSKP LTT EXPRES(18519) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • VSKP LTT EXPRES(18519) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • VSKP LTT EXPRES(18519) Departed from () at on Reached its Destination () at on Status: On Time Arrived

  • VSKP LTT EXPRES(18519) Departed from () at on Reached its Destination () at on Status: On Time Arrived